US Army Corps of Engineers
Alaska District

Public Notice Manager

POA-2012-00750, M1

Published Aug. 14, 2018
Expiration date: 9/13/2018

Mr. Roscoe Bicknell IV, with Bicknell Inc., 2275 Brandy Ln., Suite 1, Juneau, AK, 99801, states that the project purpose is to develop centrally located industrial lots. Work being proposed includes the following;
• Use a one inch suction dredge to excavate 134,000 cubic yards (CY) of sand and gravel from an area 250 feet wide, x 1450 feet, x 10 feet deep, to a new bottom elevation of -10 feet below the 0.0 foot contour of Honsinger’s Pond that would provide a stockpile of suitable material for grading and for use during future development and additional capacity for dumping of unclassified material.
• Discharge 30,734 CY of dredged material into 3.8 acres of palustrine wetlands north of the existing pond and south of Egan Drive (area 1 as shown on figure 7 of 10 dated June 18, 2018), for the development of commercial and industrial lots.
• The placement of 221,126 CY of non-frost susceptible dredged and fill material to raise the fill elevation from 21 feet to 25 feet above the 0.0’ contour to cap the 27 acres of unclassified fill in the lacustrine waters that were previously authorized.  The capping of the previously authorized fill would allow for the site to be graded for future commercial development.

The project site is located within Section 32, T. 40 S., R. 66 W., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.3552º N.,                    Longitude 134.5542º W.; located at the Honsinger Pond along Glacier Highway, in Juneau, Alaska. Please contact Andy Mitzel at (907) 753-2689,                       by fax at (907) 420-0813, or by email at: andy.mitzel@usace.army.mil if further information is desired concerning this notice.

POA-2012-00750 M1, Gastineau Channel_pN and Plans


Jump To:

Redirecting...