Public Notices

 
Redirecting...
The U.S. Army Corpsof Engineers Regulatory Program launches initial beta version of the Regulatory Request System (RRS)

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

POA-2015-25

Published Nov. 2, 2018
Expiration date: 12/3/2018

PURPOSE: The applicant, Oil search, stated purpose is to safely produce commercial quantities of liquid hydrocarbons in OSA’s State of Alaska and Arctic Slope Regional Corporation (ASRC) oil and gas leasehold by operating from a site east of the Colville River Delta; to process hydrocarbons on or near the drill sites; and to transport sales quality oil through a new export pipeline to the Kuparuk sales oil pipeline, and then to the Trans-Alaska Pipeline Service (TAPS). A secondary purpose of the Project is to further delineate geological features and hydrocarbon accumulations in OSA's leasehold utilizing the proposed infrastructure.

LOCATION: The Project would be located in the North Slope Borough (NSB) in the Pikka Unit between Kuparuk and the Colville River Unit development (Alpine), east of the Colville River, approximately 6.5 miles northwest of the Village of Nuiqsut. 

PERMIT HISTORY: In June 15, 2015 the applicant originally proposed to impact 288 acres of waters of the United States (U.S.), including wetlands (WOUS).  In July 2017, the applicant submitted a revised permit application modifying the width of the access road from 38 to 35 feet wide. This change resulted in a reduction of impacts to WOUS of 16.4 acres to 271.6 acres.  This reduction was not analyzed in the DEIS due to the timing of receipt of these changes, although this change was describe in the original Public Notice for the permit in September 2017. 

In response to comments on the DEIS, the applicant (OSA) further modified their proposal as described above.  These changes in Project description decreased the overall Project footprint by another 10.3 acres of WOUS to 261.3 acres.  This is a 27 acre reduction in impacts to WOUS from the original application dated June 15, 2015.   A difference in acreages from the Final Environmental Impact Statement (FEIS) and this PN is due to the method in which impacts were calculated.   To determine total impacts to WOUS for the proposed project the applicant used more detailed methods than those necessary for the FEIS.

This is the second Public Notice period for the Nanushuk Development Project permit application.  It includes the final project proposal and a new Compensatory Mitigation Plan.    
 

All comments should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Comments on the Public Notice for this permit can be submitted via the U.S. Postal Service to: U.S. Army Corps of Engineers, CEPOA-RD, Ms. Ellen Lyons, 2175 University Avenue, Suite 201E, Alaska 99709-4927 or also via email at: Ellen.H.Lyons@usace.army.mil. We request that you include with your comments: (1) Your name, address, and affiliation (if any); (2) Be as specific as possible when stating your concern or comment; (3) Provide any background documents to support your comments, as necessary.

POA-2015-25, Nanushuk Application_PN

POA-2015-25, Permit Application

POA-2015-25, Figure Set

POA-2015-25, Applicant Proposed Mitigation Statement