Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-1937-00008 Gastineau Channel PN

Regulatory
Published Jan. 16, 2026
Expiration date: 2/16/2026

Matthew Lindsey, Petro Marine Services, stated the purpose is to replace an existing pile-supported T-dock and fuel float with a new pile-supported T-dock and construct improvements to existing fuel lines.  PROPOSED WORK: Petro Marine Services proposes to replace the existing pile-supported T-dock with a new pile-supported T-dock. The existing tied-back timber retaining wall near shore would be removed entirely and replaced with an armor rock slope revetment. New utilities and fuel lines would be installed. The existing pile-supported fuel dock, fuel float, mooring and breasting dolphins and timber retaining wall near shore would be removed in their entirety. The new main dock would consist of large diameter steel pipe piles, steel pile caps, ACZA-treated glulam stringers, ACZA-treated timber decking, and an energy absorbing fender system. All work would be performed in accordance with the enclosed plan (sheets 1-8), dated August, 2025. Please contact Matthew Brody at (907) 201-5023, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this public notice.

 

POA-1937-00008 Gastineau Channel PN