Collin Bronson, Native Village of Eyak, stated the purpose is to optimize the dock design for practicability and long-term stability based on updated geotechnical data and site-specific environmental conditions. PROPOSED WORK: The proposed work would modify the previously authorized Cordova OSRF fixed deep-water dock to a floating dock configuration and the design of the boat launch. Work would require additional placement of 564.7 cubic yards of fill in 0.35-acre below Orca Inlet’s High-tide Line for the installation of the Wire Wall Sea Wall. Please contact Estrella Campellone at (907) 753-2518, toll free from within Alaska at (800) 478-2712, or by email at Estrella.f.campellone@usace.army.mil if further information is desired concerning this public notice.
POA-1994-01014-M4 Orca Inlet PN