Swiss engineer investigates a worn area in the Solis sediment bypass tunnel
A Swiss engineer investigates a worn area in the Solis sediment bypass tunnel. At about 18 feet by 18 feet, this tunnel is nearly the same size as the proposed dimensions for the upcoming project at Lowell Creek in Alaska. (Photo by Carly Lynch, USACE – Alaska District)

Download Image: Full Size (4.61 MB)
Tags:
Photo by: Carly Lynch |  VIRIN: 240411-A-A5015-1003.JPG