Attendees pose for a photo on the steps of the new kindergarten
Attendees pose for a photo on the front steps of the new school after the ceremony. Special design considerations include heated floors, triple-pane windows, extensive natural lighting, backup solar power and an elevated ground floor to prevent the thawing of permafrost below the building. (Courtesy photo)

Download Image: Full Size (0.16 MB)
Photo by: Cameron McLeod |  VIRIN: 240905-A-A5015-1002.JPG