Mr. George Doyle stated the purpose is to "provide roadway access to the lots within Ramstead Homestead Subdivision."
The project site is located within Section 7 & 18, T. 57 S., R. 80 E., Copper River Meridian; USGS Quad Map Petersburg D-3; Latitude 56.9324º N., Longitude 132.8769º W.; Ramstead Homestead Subdivision; Approximately 18.5 air miles north northeast of Petersburg, Alaska.
PROPOSED WORK: Construction of a 7,080-linear foot roadway system. The roadway is to be constructed by excavating ditches and using the material to build the roadway between the ditches. The excavation and embankment work would be done using a track mounted excavator. Eight 18-inch diameter by 26-inch long HDPE culverts would be installed at the slough crossings. The total volume of excavated and fill material is 7,600 cubic yards and would be placed into 5.5-acres of jurisdictional wetlands.
Please contact Matt Beattie at (907) 753-2791, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at matthew.l.beattie@usace.army.mil if further information is desired concerning this notice.
POA-2017-45, Fredrick Sound_PN