US Army Corps of Engineers
Alaska District

Public Notice Manager

POA-2018-00207

Published July 10, 2018
Expiration date: 7/25/2018

Erik Boraas, with Trail Mix Inc., P.O. Box 35693, Juneau, AK  99803, states that the project purpose is to re-locate an existing gravel surfaced trail from the Mendenhall River intertidal zone to above the high tide to allow year round access to the Mendenhall Refuge. Proposed work includes authorization to place 450 cubic yards (CY) of shot rock and 100 CY of Class I riprap fill material into 0.46 acres below the High Tide Line (approximate elevation +20.6 feet above the 0.0 foot contour) (HTL) and the Mean High Water mark (approximate elevation +15.3 feet above the 0.0 foot contour) (MHW) to relocate an existing trail. All work would be performed in accordance with the enclosed plan sheets 1 – 5, dated May 02, 2018. The project site is located within Section 36, T. 40 S., R. 65 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.361844º N., Longitude 134.625783º W.; Mendenhall Wetlands State Game Refuge, end of Industrial Boulevard, Juneau, Alaska.  Please contact Randal Vigil at (907) 790-4490, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.

POA-2018-00207, Mendenhall River_PN and PLans


Jump To:

Redirecting...