POA-2015-00025-M2, Simpson Lagoon

Regulatory
Published April 1, 2020
Expiration date: 5/1/2020

Bruce Dingeman, with Oil Search (Alaska), LLC, states the project purpose is to provide a long-term supply of make-up water with sufficient reliability and water quality assurance and allow Oil Search (Alaska), LLC, to optimize production efficiency from the Pikka Unit reservoirs.  Work being proposed includes permanent discharge of a barge and gravel fill into 6.07 acres of marine waters to construct a seawater treatment plant (STP).  Permanent discharge of gravel fill into 0.05 acres of wetlands to construct a 16.5 mile STP pipeline.  Additional work includes screeding of 7.56 acres of seafloor to allow barge access.  All work would be performed in accordance with the enclosed plan (sheets 1-16), dated February 2020.  The project site is located within Section 5, T. 13 N., R. 9 E., Umiat Meridian; Latitude 70.5113º N., Longitude 149.8639º W.; Oliktok Point, Alaska.  Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at:  Janet.L.Post@usace.army.mil if further information is desired concerning this notice.

POA-2015-00025-M2, Simpson Lagoon_PN


Jump To:

Redirecting...