ConocoPhillips Alaska, Inc states the purpose is to increase safety for equipment and vehicle traffic, support additional pigging infrastructure, and provide adequate staging space for mobile equipment required for emergency response preparedness. The proposed project would involve the discharge of 11,121 cubic yards of gravel fill material into 1.58-acres of wetlands in order to expand the existing turnaround pad and connect the Kuparuk Pipeline (KPL)/Oliktok Pipeline (OPL) Construction Road to the Spine Road, and to discharge 680 cubic yards of gravel fill material into 0.11-acres of wetlands in order to widen the shoulder at the existing intersection of the X Pad Road and the KPL/OPL Construction Road, for a total discharge of 11,807 cubic yards of gravel fill material into 1.69-acres of wetlands. All work would be performed in accordance with the enclosed plan (sheets 1-7), dated October 13, 2021. The project site is located within Section 32 and 33, T. 11 N., R. 14 E., Umiat Meridian; Latitude 70.25961º N., Longitude 148.61686º W.; in Prudhoe Bay, Alaska. Please contact Kerri Hancock at (907) 753-2719, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Kerri.C.Hancock@usace.army.mil if further information is desired concerning this notice.