Ms. Deborah Heebner’s (Hilcorp Alaska, LLC) stated purpose is to expand Milne Point Unit (MPU) B Pad to provide space for an increase in use of the existing MPU Grind and Inject (G&I) Facility. The project site is located in Milne Point Unit, within Section 18, T. 13 N., R. 11 E., Umiat Meridian; USGS Quad Map Beechey Point B-5; Latitude 70.474012º N., Longitude -149.41495º W.; North Slope Borough, Alaska. PROPOSED WORK: The placement of 74,400 cubic yards (cy) of fill material into 5.3 acres of jurisdictional Palustrine emergent wetlands for the expansion of B Pad for additional facilities for the operations of the permitted MPU G&I Facility. Additional pad space is required for additional offloading facilities, transport truck lanes, equipment turnaround areas, ramps and support facilities at MPU B Pad. All work would be performed in accordance with the enclosed plan (sheets 1 of 4), dated May 2016. Please contact Ms. Heather Markway at (907) 753-2797, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.n.markway@usace.army.mil if further information is desired concerning this notice.
POA-1981-92-M19, Beaufort Sea_PN