POA-2014-107

Published Dec. 21, 2016
Expiration date: 1/21/2017

Mr. David Totemoff stated purpose is to provide a stable foundation for the proposed fuel system. The project site is located within Section 5, T. 12 S., R. 8 W., Copper River Meridian; USGS Quad Map AK-CORDOVA D-8; Latitude 60.8624º N., Longitude 146.6787º W.; in Tatitlek, Alaska. Proposed work is to excavate and remove 4.5’ of organic overburden and construct 108’x80’ gravel pad on underlying gravelly silt. A new bulk fuel tank farm consisting of one 11,600-gallon, protected, horizontal, dual product dispensing tanks (7,100 diesel and 4,500 gasoline). This tank will be placed on a gravel pad constructed of imported gravel within a lined, concrete wall containment area. A new drive in fuel transfer area within a secondary curbed concrete containment area. Containment described in (1) and (2) is adjoined and continuous. This area includes a new truck fill header and hose reel dispenser for NVT fleet equipment and vehicles. A new gasoline retail dispenser and spill response connex, adjacent to item (1) New Electrical controls, spill response equipment and regulatory documents as required. Please contact Danielle Knight at (907) 753-2728, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Danielle.g.knight@usace.army.mil if further information is desired concerning this notice.

 

POA-2014-107, Tatitlek Narrows_PN

POA-2014-107,Tatitlek Narrows_PN_Drawings