Ms. Deborah Heebner (Hilcorp Alaska, LLC) stated purpose is to expand Milne Point Unit (MPU) F Pad to provide space for up to eight additional development wells. The project site is located in Milne Point Unit, within Section 6, T. 13 N., R. 10 E., Umiat Meridian; USGS Quad Map Beechey Point C-5; Latitude 70.507606º N., Longitude -149.660607º W.; North Slope Borough, Alaska. PROPOSED WORK: The placement of 43,500 cubic yards (cy) of gravel fill material into 3.2 acres of jurisdictional Palustrine emergent wetlands for the expansion of F Pad and construction of up to 8 additional wells. Space is also needed to install associated infrastructure to facilitate production activities from the new development wells at MPU F Pad. All work would be performed in accordance with the enclosed plan (sheets 1 of 4), dated December 2016. Please contact Heather Markway at (907) 753-2797, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at regpagemaster@usace.army.mil if further information is desired concerning this notice.
POA-1994-757-M4, Beaufort Sea_revised PN