The applicant has revised their project to include the discharge of an additional 4,400 cubic yards of shot rock and 900 cubic yards of armor rock into 0.3 acre below the HTL and MHWM of Dutch Harbor (see Sheet 2 of 4). This change would result in an overall discharge of 41,900 cubic yards of shot rock and 9,300 cubic yards armor rock into 3.0 acres below the HTL and MHWM of Dutch Harbor. Additionally, the applicant proposes to utilize fill material from an adjacent upland quarry. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated May 18, 2016, and February 2017. The project site is located at the UMC Dock within Section 35, T. 72 S., R. 118 W., Seward Meridian; USGS Quad Map Unalaska C-2; Latitude 53.9031º N., Longitude 166.5277º W.; southwest of UMC existing Dock Position VII, water ward of Ballyhoo Road, in Unalaska, Alaska. Please contact Ms. Jen Martin at (907) 753-2730, by fax at (907) 420-0813, or by email at jen.l.martin@usace.army.mil if further information is desired concerning this notice.
POA-1989-324-M8, Dutch Harbor_Revised PN