Mr. Russell Thomas (Clover Pass Resort) stated the purpose is to provide boat ramp access to launch and retrieve boats, provide additional cabins for tourists, and housing for staff.
The project site is located within Section 12, T. 74 S., R. 89 E., Copper River Meridian; USGS Quad Map Ketchikan B-6; Latitude 55.4742º N., Longitude 131.8142º W.; near Ketchikan, Alaska.
PROPOSED WORK: Discharge 90.5 cubic yards of concrete, 57 cubic yards of rip rap, and 1160 cubic yards of clean fill material to upgrade the current resort facilities. All work would be performed in accordance with the enclosed plan (sheets 1-8), dated August 28, 2017.
Please contact Michael R. Gala at (907) 753-2821, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at michael.r.gala@usace.army.mil if further information is desired concerning this notice.
POA-1986-428-M4, Clover Passage_PN
POA-1986-428-M4, Clover Passage_PN_plans