Ms. Dunham (Harvest Alaska, LLC) stated the purpose is to construct the new Tyonek W 10 gas and Tyonek W 8 oil pipelines between Tyonek Platform and Ladd Landing.
The project site is located within Section 6, T. 12 N., R. 9 W., Section 1, T. 11 N., R. 10 W., Sections 20, 27-29, 34-36, T. 12 N., R. 10 W., Seward Meridian; USGS Quad Map Tyonek A-3; Latitude 61.0969º N., Longitude 151.0412º W.; from the Beluga Pipeline Junction to Tyonek Platform via Ladd Landing, near Tyonek, Alaska.
The applicant is proposing to discharge 3,300 cubic yards (cy) of seacrete anchors and concrete guides into 1.23 acres of tidal waters for the installation of a 5.5 mile long 8 inch oil and a 10 inch gas pipeline from Ladd Landing to the Tyonek Platform across to the seabed of Cook Inlet. All work would be performed in accordance with the enclosed plan (sheets 1-18), dated February 13, 2018.
Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 420-0813, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice.
POA-2017-509, Cook Inlet_PN
POA-2017-509, Cook Inlet_PN_Plans