Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2018-00082

Published March 15, 2018
Expiration date: 3/30/2018

Brice Conklin stated that the purpose is to develop a gravel mine site.  The project site is located within Section 2, T. 11 S., R. 22 W., Kateel Meridian; USGS Quad Map Solomon C-3; Latitude 64.56208º N., Longitude 163.0137º W.; north of Golovin, Alaska. The applicant proposes to perform  Mechanized land clearing of 1.01 acres for the development of a 210’ x 210’ gravel mine site in order to mine 15,000 cubic yards (cy) of Crushed Aggregate Surface Course (CASC) material and the placement of approximately 85 cy of fill material into 0.017 acre for the construction of a 30’ x 25’ access road, with a total impact to 1.03 acres of wetlands.  Overburden and materials not meeting CASC specifications would be stockpiled in the Existing Landfill Pit #1 as shown on sheet 2 of 5.  Work is proposed to start May 15, 2018 with mining being completed by June 1, 2018.  Ground disturbance would be completed by May 19, 2018, to conform to the bird window of May 20 – July 20. All work would be performed in accordance with the enclosed plan (sheets 1-5), dated March 5, 2018. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army mil if further information is desired concerning this notice.

POA-2018-00082, Golovin Bay_PN and Drawings