Aleut Community of St. Paul Island, 4270 Business Park Boulevard, Suite G-40, Anchorage, Alaska 99503 states that the project purpose is to provide alternative access to the residential area of St. Paul, and a flood control barrier for frequent storm surges. Work being proposed includes the discharge 13,300 cubic yards (CY) of sand or unclassified fill into 0.98 acres of waters of the U.S. to construct a 1,647-linear foot long roadway which would connect Polovinia Turnpike to the southern residential area on St. Paul Island. The proposed road would have two twelve-foot wide lanes, a total right-of-way width of 40-feet, and one twenty four-inch diameter culvert. All work would be performed in accordance with the enclosed plan (sheets 1-11), dated July 6, 2018. The project site is located within Section 25, T. 35 S., R. 135 W., Seward Meridian; Latitude 57.1208º N., Longitude 170.2880º W.; near Polovina Turnpike; in St. Paul, Alaska. Please contact Andrew Gray at (907) 753-2722, by fax at (907) 420-0813, or by email at Andrew.a.gray@usace.army.mil if further information is desired concerning this notice
POA-2018-00268, Zolotoi Bay_PN and Plans