Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2005-1813-M2

Published Aug. 31, 2018
Expiration date: 10/1/2018

Chris McGraw, with Halibut Point Marine Services LLC, PO Box 718, Sitka, AK, 99835, states that the project purpose is to construct a new shore bollard for the existing multi-use dock at Halibut Point Marine to accommodate larger cruise ships docking in Sitka. Work being proposed includes discharge of 1,100 cubic yards (CY) of clean shot rock fill/riprap and 18 CY of concrete into 2,600 square feet (sf) of tidal waters below the high tide line (HTL) (12.8 feet above the 0.0 feet contour) and below the mean high (MHW) (9.2 feet above the 0.0 feet contour) of Sitka Sound, down to the -4.0 feet elevation for the construction of a new pad to install a shore bollard.  The project site is located within Section 9,     T. 55 S., R. 63 E., Copper River Meridian; USGS Quad Map Sitka       A-5; Latitude 57.1153º N., Longitude 135.3928º W.; approximately 3/4 of a mile north of the Sitka Ferry Terminal at Halibut Point Marine, north of Sitka,  Alaska. Please contact Andy Mitzel at (907) 753-2673, by fax at        (907) 420-0813, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice.

POA-2005-1813-M@, Sitka Sound_PN and PLans