Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2003-00502, Knik Arm

Regulatory
Published Feb. 13, 2020
Expiration date: 2/28/2020

The Municipality of Anchorage, Port of Alaska, 2000 Anchorage Port Road, Anchorage, Alaska  99501, states that the project purpose is to replace the existing Petroleum Oil Lubricants Terminal (POL1), which is more than 50 years old, severely corroded, and marginally safe with a new Petroleum and Cement Terminal (PCT).  The POL1 is the only bulk cement–handling facility in Alaska and the primary terminal for receipt of refined petroleum products. Work being proposed includes:  To construct the PCT, a new pile supported structure consisting of a loading platform, access trestle, mooring dolphins with connecting catwalks, and utility, petroleum, and cement pipelines.  Approximately, 276 piles of varying diameters (24-inch up to 144-inch), will be installed via impact and/or vibratory hammer methods.  All temporary piles will be removed after each construction season.  All work would be performed in accordance with the enclosed plan (sheets 1-10), dated February 2020. The project site is located within Knik Arm at the Port of Alaska, Section 7, T. 13 N., R. 3 W., Seward Meridian; USGS Quad Map Anchorage A-8X; Latitude 61.234º N., Longitude -149.893º W.; in Anchorage, Municipality of Anchorage, Alaska. Please contact Ms. Arianne Logwood at (907) 753-5556, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at:  arianne.n.logwood@usace.army.mil if further information is desired concerning this notice.