Mr. Rolland Curtis, states the project purpose is to restore a piling supported floating dock and contain the property with a stacked rock wall with fill. Work being purposed includes to discharge up to 4,520 cubic yards (CY) of fill material into 0.04-acre below the High Tide Line (HTL) of Zimovia Strait in order to create a stacked rock wall (273 CY) and fill behind the wall to level the ground with the top of the wall (4,247 CY shot rock). Additionally, six 13-inch diameter galvanized steel piles would be installed along the face of the rock wall to support a 10-foot wide by 130-foot long dock. Piles would be driven from the constructed fill pad at low tide, when the area is completely dewatered. All work would be performed in accordance with the enclosed plan (sheets 1-3), dated November 24, 2020. The project site is located at Latitude 56.4652º N., Longitude 132.3849º W.; 1448 Peninsula Boulevard, in Wrangell, Alaska. Please contact Ms. Roberta Budnik at (907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further information is desired concerning this notice.
POA-2020-00447, Zimovia Strait_PN