Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2021-00145, Sukkwan Straight_PN

Regulatory
Published July 12, 2021
Expiration date: 8/11/2021

The City of Hydaburg, states the purpose of the project is to provide safe sewage treatment and disposal system. Work being proposed, dredging of 3,000 cubic yards (CY) of fill material in 0.31 acres below Mean High Water (MHW), blasting of 500 CY of rock within an area of 0.10 acres below MHW, and discharge of 2,732 CY of fill material into 0.31 acres below the High Tide Line (HTL) for the construction of four (4) 10-foot diameter sewage settling tanks (two 25,000 gallon and two 22,000 gallon tanks), an effluent pump station, and associated appurtenances. The proposed work also involves the discharge of 1,733 CY of fill material within an area of 0.32 acres below HTL for construction of a 14-foot-high by 30-foot-wide temporary berm which will be in place for approximately 6-weeks. All work would be performed in accordance with the enclosed plan (sheets 1-7), dated May 2021. The project site is located within Section 12, T. 77 S., R. 83 E., Copper River Meridian; Latitude 55.205º N., Longitude 132.8277º W.; near Hydaburg, Alaska. Please contact Andrew Gregory at (907) 753-2791, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at: Andrew.W.Gregory@usace.army.mil if further information is desired concerning this notice.

 

 

POA-2021-00145, Sukkwan Straight_PN