Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2022-00072, Engineer Creek_PN

Regulatory
Published March 14, 2022
Expiration date: 4/13/2022

Blue Yonder Construction, LLC. (Christian Funk), PO Box 2388, Gardnerville, Nevada 89410, libertyhomesnv@gmail.com, states the purpose is to construct a residential subdivision on the eastern portion of the property (Phase I) and, at a later date, develop the uplands western portion of the property as a commercial site. The project would place 15,635 cubic yards of tailings and 500 cubic yards of 2-inch minus aggregate into 4 acres PSS4/1B wetlands to construct 1,000 linear feet of access roads and one turnaround with associated drainage features in for Phase I residential development. All work would be performed in accordance with the enclosed plan (sheets 1–6), dated March 08, 2022. The project site is located within Section 6, T. 1 N., R. 1 E., Fairbanks Meridian; USGS Quad Map Fairbanks D–2; Latitude 64.93716° N., Longitude 147.635° W.; Gold Mine Subdivision on Gold Mine Trail, Fairbanks North Star Borough near Fairbanks, Alaska. Please contact Ellen Lyons at (907) 347-3481, or by email at ellen.h.lyons@usace.army.mil if further information is desired concerning this notice.