The City of Akutan (point of contact: Joe Bereskin), P.O. Box 109, Akutan, AK 99553, states the purpose is to provide road access between Akutan boat harbor and Trident Seafood Plant. To discharge 29,500 cubic yards of crushed rock, 20,000 cubic yards of riprap, and 2,000 cubic yards of surface aggregate (gravel/sand) into 0.8-acre of wetlands and 2.6-acres of marine waters of Akutan Harbor, a navigable water of the U.S. The work would include a 1.25-mile road with 12 foot wide drivable surface with several turnouts along the way, as well as, a culvert in North Creek and a bridge over Whalebone Creek. All work would be performed in accordance with the enclosed plan (sheets 1-18), dated December 13, 2022. The project site is located within Section 9, 10, 11, T. 70 S., R. 112 W., Seward Meridian; USGS Quad Map Unimak A-6; Latitude 54.131º, Longitude -165.833º; in Akutan, Alaska. Please contact Ms. Delana Wilks by phone at (907) 201-5021 or by email at Delana.P.Wilks@usace.army.mil if further information is desired concerning this notice.