Alaska Department of Transportation and Public Facilities (ADOT&PF) stated the purpose of the Dalton Highway MP 120–135 Reconstruction Project (project) is to improve safety of the Dalton Highway between MP 120 through MP 135 and MP 135.5 through 138.1 using current design standards. The project site is located at Section 31, T. 41 S., R. 67 E., Copper River Meridian; USGS Quad Map Juneau B-2 SW; Latitude 58.2691º N, Longitude 134.5161º W; in Juneau, Alaska. PROPOSED WORK The proposed work consists of the original scope of work, along with the added expansion of the material site and the proposed repairs to the thermal berms consisting of 67.04 acres of permanent impacts to WOTUS from the discharge of approximately 160,707 cubic yards (cy) of fill, including 779,075 cy of excavation in WOTUS. Temporary impacts would be approximately 21.52 acres of WOTUS (see Tables 3 and 4). This project includes structural embankment replacement, realignments, widening, and resurfacing of the 15-mile segment. Additional scope added to this project includes the construction of thermal berms between MP 135.5-138.1, resulting in 7.12 acres of permanent impact and 5.07 acres of temporary impacts to WOTUS (included in the total impacts above). This work would constitute the first phase of a multi-phase project along the Dalton Highway between MP 109-144. All work would be performed in accordance with the enclosed plan, dated February 20, 2024. Please contact Amanda Locken at (907)347-6148, toll free from within Alaska at (800) 478-2712, or by email at Amanda.N.Locken@usace.army.mil if further information is desired concerning this public notice.
POA202200511Bonanza Creek PN Revised
POA202200511 Bonanza Creek PN