Dave Mock, Rappe Excavating, Inc, stated the purpose is to expand the existing pad in order to add more parking and storage space for their company to utilize to help the business grow and meet increased storage space demands. PROPOSED WORK The applicant proposes to discharge 6,000 cubic yards of dirt, 1,000 cubic yards of brush, and 2,000 cubic yards of stumps into 0.83-acre of palustrine scrub-shrub/forested wetlands. All fill material would be placed into a 215 feet long by 185 feet wide by 8 feet high area in order to make a rectangular lot with existing fill. Material would be sourced from nearby Matanuska-Susitna Borough road projects. The Matanuska-Susitna Borough contractor would haul the road material to the site, as well as haul topsoil and stumps from the contractor’s own commercial lot. Work would occur in phases and is anticipated to begin as soon as all necessary permits are received. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated December 21, 2017. Please contact Hayley Farrer at (907) 753-2788, toll free from within Alaska at (800) 478-2712, or by email at Hayley.M.Farrer@usace.army.mil if further information is desired concerning this public notice.
POA-2017-00395 Jacobsen Lake PN