Bicknell, Inc stated the purpose is to perform ground preparation by excavating the organic grass layer and placing clean fill materials from an upland quarry location in Juneau on the existing undeveloped site for supporting a soil reclamation facility, equipment shop building, office building and boat condos. PROPOSED WORK: To place 22,672 cubic yards of shot rock into 5.48 acres of wetlands. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated April 19, 2024. Please contact Ms. Delana Wilks at (907) 201-5021, or by email at Delana.P.Wilks@usace.army.mil if further information is desired concerning this public notice.
POA-2024-00193 Mendenhall River PN