Tina Fairbanks, Kodiak Regional Aquacultural Association, stated the purpose to replace the Kitoi Bay Fish Hatchery dock that has exceeded its useful life. PROPOSED WORK: The project consists of removing approximately 1,455 square feet of an obsolete dock, including a failing wood bulkhead, and approximately 26 existing wood piles. After the removal of the obsolete dock, a 106-foot-long retaining wall to support a new dock would be built. This retaining wall would be constructed by placing 159 2-foot by 2-foot by 4-foot precast concrete blocks. The retaining wall would have a cement foundation made on-site by pouring approximately 6 cubic yards of cement at the base of the wall, this would be done during low tides and dewatered conditions. Please Estrella Campellone at (907) 753-2518, toll free from within Alaska at (800) 478-2712, or by email at Estrella.f.campellone@usace.army.mil if further information is desired concerning this public notice.
POA-2024-00475 Kitoi Bay PN