Gustavo Garcia, stated the purpose is to have a smooth front yard that is clear of hazardous rocks. PROPOSED WORK: The completed work involved the discharge of140 cubic yards of sand, gravel, and topsoil, including rock/boulders into 0.11 acres below the high tide line (approximate elevation +20.6 feet above the 0.0 foot contour) to construct a 100 foot wide by 49 foot long yard associated with an existing residence. All work would be performed in accordance with the enclosed plan (sheets 1-3), dated September, 2024. Please contact Delana Wilks at (907) 201-5021, or by email at Delana.P.Wilks@usace.army.mil if further information is desired concerning this public notice.
POA-2024-00352 Indian Cove PN