Petersburg Medical Center (PMC); Philip Hofstetter; stated the purpose is to extend the road to connect Haugen Drive to Excel Street, for routing emergency vehicles and hospital visitors from downtown and north Petersburg. The proposed water line connection would provide a loop to improve pressure and limit users effected by repairs or emergency shutoff of the water system. PROPOSED WORK: The applicant is proposing to discharge 6,267 cubic yards of structural fill into 0.32-acre of palustrine wetlands in order to create an additional emergency access route and water line access to the Petersburg Medical Center. Overburden generated by access route and water line construction would be hauled to an existing material site near the rock quarry. The work would start the summer of 2025 and be completed in the fall of 2025. All work would be performed in accordance with the enclosed plan (sheets 1-4) dated March 12, 2025. Please contact Estrella Campellone at (907) 753-2518, toll free from within Alaska at (800) 478-2712, or by email at Estrella.f.campellone@usace.army.mil if further information is desired concerning this public notice.
POA-2023-00172 Hammer Slough PN