Ocean Beauty Seafoods' stated purpose of this project is to provide additional operating room for their facility. Extend the existing pile supported dock by constructing a 30’ by 150’ (4,500 square feet) addition. The extension would be supported by 75 each, 12” diameter by approximately 21’ to 28’ long untreated piles, driven to a depth of approximately 15’ to 20’. Pile caps and timber joists would support the 4” by 12” timber decking. Piles would be driven with either an ICE 14-23 vibratory hammer or an MKT9B3 air hammer. Construction is scheduled between May and September. Please contact Jack Hewitt at (907) 753-2708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at jack.j.hewitt@usace.army.mil if further information is desired concerning this notice.
POA-1978-296-M3, Naknek River_PN
POA-1978-296-M3, Naknek River_PN Drawings