Bering Pacific Seafoods' stated purpose is to provide a protected and efficient platform to off-load fish product for their operations, as well as general support of the fishing efforts in the False Pass area. Proposed Work: Drive 36 - 16” diameter steel piles, and 27 - 14” diameter wood piles, below the mean high water mark (3.9 feet) of Isanotski Strait with an HPI 300 vibratory hammer, to support a 40’ by 160’, timber framed and decked dock. Construction is scheduled for the summer of 2013. Please contact Jack Hewitt at (907) 753-2708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at jack.j.hewitt@usace.army.mil if further information is desired concerning this notice.