BP Exploration (Alaska) Inc.'s stated purpose is to expand the gravel pad at H Pad in the Milne Point Unit in order to accommodate drill rig access and movement, as the rigs used for existing well head work are larger than the ones used when the pad was constructed. Proposed work: Expand the existing H Pad in the Milne Point Unit by placing 7,100 cubic yards of clean gravel fill on 0.60 acres of tundra. Tundra travel will not be necessary, as the gravel would be placed while the equipment is working from the existing pad. Gravel will be obtained from previously permitted sources. Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at janet.l.post@usace.army.mil if further information is desired concerning this notice.
POA-2013-398, Ugnuravik River_PN
POA-2013-398, Ugnuravik River_PN Drawings