H and A Development's stated purpose is to stabilize the property from erosion and make it usable for a driftwood log processing facility. Proposed work: Placement of 5,175 cubic yards of fill material (including shot rock, rip rap, and D-1) within 0.16 acres of waters of the U.S. below the High Tide Line (19.4; HTL) of Tongass Narrows. The proposed fill pad is 46-feet by 273-feet (of which 0.16 acres is below the HTL) and would include a seawall in two different locations. The proposed sea wall is 294-foot long by 4-foot wide by 21.5-foot deep on the south end of the project area and 75-foot long by 4-foot wide by 17-foot deep at the north end. The proposed work would also include extending two 18-inch HDPE plastic culverts into Tongass Narrows to convey highway drainage across the proposed industrial development. Please contact Marcia L. Heer at (907) 753-5759, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Marcia.L.Heer@usace.army.mil if further information is desired concerning this notice.
POA-2013-210, Tongass Narrows_PN
POA-2013-210, Tongass Narrows_PN Drawings