City of Kodiak stated purpose is to replace the existing Pier 3 located on Rezanof Drive W. near the foot of Pillar Mountain. The proposed project would place 36,000 cubic yards (CY) of fill and 10,500 CY of rock into 1.60 acres below High Tide Line (HTL). The proposed project would be constructed adjacent to the east end of the existing Pier 3 and would be 115 feet wide by 420 feet long, utilizing 120 piles. Minor dredging of the ocean floor would allow for water depths of approximately -45 ft MLLW at the face of the new pier. To the greatest extent possible, dredged materials would be reused in the areas on the eastern side of the new pier where fill would be required. Please contact Ms. Amanda Whittier by email at Amanda.L.Whittier@usace.army.mil or by phone (907) 753-5582, toll free from within Alaska at (800) 478-2712, or by fax at (907) 753-5567, if further information is desired concerning this notice.
POA-2013-23, Chiniak Bay_PN
POA-2013-23, Chiniak Bay_PN_Drawings