The nature of the activity is to expand the OTP, install a 12-inch 3-phase above-ground flowline from the OTP to DS3H, install a 12-inch seawater above-ground flowline from the OTP to a new seawater tie-in pad, and expand the offshore ODS. Discharge a total of 189,450 cubic yards of gravel fill material into navigable waters, inland surface waters, and wetlands.  USACE PROJECT MANAGER:  Harry A. Baij Jr.,Alaska District, Regulatory Division, E-mail address:  harry.a.baij@usace.army.mil; Office phone:  907-753-2784, Cell phone: 907-782-7517, Toll-free phone (within Alaska):  800-478-2712.
 