Mr. Jim Taro's stated purpose is to create additional mooring and protect the area from waves. PROPOSED WORK: Proposes to add a 12-foot by 50-foot dock onto the existing dock, and construct a 10-foot by 220-foot breakwater secured with four 10,000 pound steel Danforth anchors below the mean high water of Tongass Narrows. All work would be performed in accordance with the enclosed plan (sheets 1-5), dated October 30, 2013. Please contact Shane McCoy at (907) 753-2715, toll free from within Alaska at (800) 478-2712, by fax at (907) 279-0064, or by email at Shane.M.Mccoy@usace.army.mil if further information is desired concerning this notice.