DOI – National Park and Preserve AKRO's stated purpose is to repair and realign the existing off-road vehicle trail. Discharge up to 10,000 cubic yards of native soil and gravel into a maximum of 10.4 acres of wetlands and 0.1-acre of waterways. The proposed project would consist of hardening the existing Copper River Trail’s surface, and rerouting the trail to firmer surfaces. Trail hardening would be completed in a variety of methods, depending on specific site conditions. Please contact Roberta K. Budnik at (907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further information is desired concerning this notice.
POA 2012-328, Copper River_PN
POA 2012-328, Copper River_PN Drawings