ASRC Civil Construction, LLC's stated purpose is to expand an existing gravel mine to source gravel. The project would supply approximately one-half of the necessary fill material for the St. Mary’s/Mt. Village Road Rehabilitation Project. ASRC Civil Construction, LLC proposes to discharge dredged and/or fill material into 0.64-acre of scrub-shrub/emergent wetlands in conjunction with the expansion of Pitka’s Point Pit. The pit would be expanded in the east-west direction by 50 feet on each side, with work in wetlands consisting of overburden removal, stockpiling, and construction of berms at the pit perimeter. Mining would be completed to an overall depth of 10-15 feet below original grade down to the existing pit floor. Reclamation for this proposal would consist of distributing overburden and organics at the perimeter of the development, dressing slopes to 4:1, and seeding as needed. All work would be performed in accordance with the enclosed plan (sheets 1-3), dated March 28, 2014. Please contact Jason Berkner at (907) 753-5778, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Jason.R.Berkner@usace.army.mil if further information is desired concerning this notice.
POA-2014-128, Andreafsky River_PN
POA-2014-128, Andreafsky River_PN Drawings