Expiration date: 9/13/2015

The applicant has described the project as erosion repair and channel realignment for the purpose of protecting the existing North Fork Road bridge infrastructure.  The applicant proposes to discharge dredged and fill material into 0.33 acre of the North Fork Anchor River (NFAR) below the ordinary high water mark (OHWM), and into 0.9 acre of wetlands adjacent to the NFAR. Please contact Michael Setering at (907) 753-2627 or by email at Michael.t.setering@usace.army.mil if further information is desired concerning this notice.

 

POA 2015-435 North Fork Anchor River (1)

POA-2015-435, drawings, North Fork Anchor River