Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

POA-2016-177, South Fork Little Campbell Creek

Published May 4, 2016
Expiration date: 6/2/2016

Alaska Department of Transportation and Public Facilities(ADOT&PF)stated purpose is to provide a roadway that accommodates projected traffic volumes through 2035, provide enhanced transportation for pedestrian and non-motorized traffic and improves safety for corridor users. The proposed project consists of two construction phases. Phase I covers O’Malley Road from Seward Highway to Livingston Street, and is expected to begin construction in 2016. Phase II covers O’Malley Road from Livingston Street to Hillside Drive, and is expected to begin construction in 2018. The total proposed project would discharge 91,329 cubic yards of fill into 2.12 acres of wetlands and 395 linear feet of stream. Both phases would be permitted together. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800)478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice.

POA-2016-177, South Fork Little Campbell Creek_PN

POA-2016-177, South Fork Little Campbell Creek_PN Drawings