Public Notices

 
Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

POA-2015-16

Published Aug. 21, 2017
Expiration date: 9/20/2017

Ms. Kate Kaufman (Hilcorp Alaska, LLC) stated the purpose for the development is to recover oil from the Liberty Prospect and transport it to the Trans Alaska Pipeline System via the Badami Pipeline.

The project site is located within two federal leases (OCS-Y1650 and OCS-Y1585), in Foggy Island Bay within the Beaufort Sea, northeast of the Prudhoe Bay Unit, and east of the Duck Island Unit. The Liberty Development Production Island (LDPI) will be located approximately 5 miles north of the Kadleroshilik River in approximately 19 feet of waters at Latitude 70.2746º N., Longitude 147.5863º W.

Hilcorp Alaska, LLC (HAK) proposes to construct a self-contained offshore drilling and production facility located in the Beaufort Sea OCS. A 12-inch sales oil pipeline inside a 16-inch outer pipe will transport crude oil from the facility to the Badami Sales Oil Pipeline. The offshore portion of the pipeline will be trenched on the ocean floor. The overland portion of the pipeline will be trenched for 350 feet (ft) from the shoreline, and then elevated approximately 7 ft high on vertical support members (VSMs) for most of the remaining distance to the Badami tie-in. The onshore pipeline will go underneath a newly constructed gravel pad where it intersects with the Badami ice road. A second gravel pad will be constructed at the pipeline tie-in point with the Badami Pipeline. HAK also proposes to mine the gravel needed for the project from a selected nearby site. All work would be performed in accordance with the enclosed plan (sheets 1 – 23), dated 06/13/17.

Please contact Heather Markway at (907) 753-2797, or by email at Heather.N.Markway@usace.army.mil if further information is desired concerning this notice.

POA-2015-16, Beaufort Sea_PN