Public Notices

 
Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

POA-2023-00343 Kuparuk River PN

Regulatory
Published July 25, 2023
Expiration date: 8/24/2023

Ms. Keri Iles, Hilcorp North Slope, LLC, 3800 Centerpoint Drive, Suite 1400, Anchorage, Alaska  99503 states that the purpose is “the current pipeline and header system limit the capacity to produce economic wells at L, V, W, and Z pads. The purpose of this project is to improve flow from EWE [Eileen West End] Junction to GC2 [Gathering Center 2] through the installation new production and new gas lift line. The new EWE pipelines will reduce existing constraints and improve capacity for the pursuit of economic wells at these pads.” Hilcorp North Slope, LLC (Hilcorp) is proposing the installation of two new pipelines between Gathering Center 2 (GC2) and Eileen West End (EWE) located in the Western operating area of the Prudhoe Bay unit. The two pipelines as proposed will be approximately 35,000 feet long with one pipeline being 30 inches in diameter and the second pipeline being 14 inches in diameter and would be placed on a combination of new and existing vertical support members and horizontal support members. In addition to the installation of two new pipelines a pad expansion will be required at EWE junction to support pipeline tie-in infrastructure. The project as proposed will cumulatively discharge up to 13,000 cubic yards of clean gravel material from Kuparuk Mine Site C and supplemented with clean reclaimed gravel material from the Kuparuk River and 2,000 cubic yards of a sand/slurry mixture impacting 1.4 acres of palustrine emergent wetland. The project site is located at Latitude 70.307815, Longitude -149.086678; near the Kuparuk River, North Slope Borough, Alaska. Please contact Allen Atkins at (907) 753-2780, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at patrick.a.atkins@usace.army.mil if further information is desired concerning this notice.