Public Notices

 
Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

POA-2016-177, South Fork Little Campbell Creek

Published May 4, 2016
Expiration date: 6/2/2016

Alaska Department of Transportation and Public Facilities(ADOT&PF)stated purpose is to provide a roadway that accommodates projected traffic volumes through 2035, provide enhanced transportation for pedestrian and non-motorized traffic and improves safety for corridor users. The proposed project consists of two construction phases. Phase I covers O’Malley Road from Seward Highway to Livingston Street, and is expected to begin construction in 2016. Phase II covers O’Malley Road from Livingston Street to Hillside Drive, and is expected to begin construction in 2018. The total proposed project would discharge 91,329 cubic yards of fill into 2.12 acres of wetlands and 395 linear feet of stream. Both phases would be permitted together. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800)478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice.

POA-2016-177, South Fork Little Campbell Creek_PN

POA-2016-177, South Fork Little Campbell Creek_PN Drawings