Public Notices

 
Redirecting...

The Regulatory Request System (RRS).
Stay tuned for updates!

Contact Us

Phone: (907) 753-2712

Regulatory General Email

Application Email

Customer Survey

Report a Violation

If there is a problem with the website (i.e., link doesn't work) please contact us

Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

POA-2014-288-M1, Cook Inlet

Published July 12, 2016
Expiration date: 7/26/2016

BlueCrest Alaska Operating LLC's stated purpose is to conduct a two-well offshore exploratory drilling program within ADL 384403. BlueCrest Alaska Operating LLC's proposes to conduct exploratory drilling at two new well locations utilizing the Spartan 151 jack-up rig.  The new well locations would be within 100 feet of these coordinates: (Well A2) Latitude 59.886906º N., Longitude 151.882778º W.; and (Well A6) Latitude 59.886914º N., Longitude 151.882781º W. Drilling is proposed to begin in summer of 2017 and would take 40 days per well to complete. If delays occur, drilling may occur in 2018. Drilling would occur in the open water season, generally between April and November. In addition to the proposed drilling, other activities that would require a DA authorization include drive pipe hammering, which is the process by which a drive pipe is driven into the sediment prior to the drilling of the oil well.  The drive pipe prevents loose substrate from collapsing on to and obstructing the well bore. The proposed drive pile would be 30 inches in diameter, and would be installed to 200 feet below the mudline using an impact hammer Driving of the drive pile would take 1 to 3 days at each well site. Please contact Katherine A. McCafferty at (907) 753-2692, by fax at (907) 420-0813, or by email at Katherine.a.mccafferty2@usace.army.mil if further information is desired concerning this notice.

POA-2014-288-M1,Cook Inlet_PN

POA-2014-228-M1 sheets 1-3_20160622

POA-2014-228-M1 sheet 1_20160513