Mr. Stephen Ribuffo (Municipality of Anchorage, Port of Alaska) stated the purpose is to construct the Petroleum and Cement Terminal (PCT) to replace the existing Petroleum Oil and Lubricants Terminal (POL) 1 terminal with a new structure that exceeds current seismic standards.
The project site is located within Section 7, T. 13 N., R. 3 W., Seward Meridian; USGS Quad Map Anchorage A-8; Latitude 61.23350º N., Longitude 149.98507º W.; in Anchorage, Alaska.
The Municipality of Anchorage through its Port of Alaska Department (Port) proposes to construct the PCT project during 2018 and 2019. The Port’s permit application seeks two Department of the Army permits, one for each year. See the enclosed Permit Application for a complete project description.
Please contact Ms. Amanda Heath at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Heath@usace.army.mil if further information is desired concerning this notice.
POA-2003-502-M11, Knik Arm_PN
POA-2003-502-M11, Knik Arm_PN_Application