POA-2013-538, Putuligayuk River

Published Feb. 3, 2014

***PUBLIC NOTICE REVISION***

Aidea's stated purpose is to reduce fuel costs and improve air quality within the Fairbanks North Star Borough (FNSB) by making a supply of liquefied natural gas available on the North Slope of Alaska for overland transportation to the FNSB to meet residential, commercial, and industrial demands. Construct a liquefied natural gas production facility.  Construct a liquefied natural gas production facility. The total proposed discharge of fill material into wetlands is now reduced to 14.76 acres from the previous proposal of 14.97 acres, or 0.21 acre less. A proposed increase of 20,350 cubic yards of gravel fill material discharged into wetlands would occur at the new fill location due to the different topography and settling. Fill would be discharged into wetlands for construction of an operations pad that would support infrastructure and operations of a liquefied natural gas facility. Comments must be submitted to Harry A. Baij Jr., Project Manager, by e-mail message at harry.a.baij@usace.army.mil, by telephone at (907) 753-2784, or toll-free from within Alaska at (800) 478-2712.

 

POA-2013-538, Putuligayuk River_PN

POA-2013-538, Putuligayuk River_PN Drawings