Expiration date: 3/4/2013
ASRC SKW Eskimos' stated purpose is to construct a building pad for a three story, pre-fabricated modular hotel structure with a single story common lobby and restaurant.
The proposed project would require placement of approximately 6,700 cubic yards of fill material in approximately 1.30 acres of palustrine wetlands. Earth work activities will consist of geo-textile, fill and insulation board placement. The bulk of fill will be placed under frozen conditions in 2013. Final surfacing and grading will occur in thawed conditions (fall of 2013 or summer 2015). Foundation work will include drilling, setting and sand/water slurry installation of approximately 150 timber pilings. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated January 9, 2013.