Applicant |
Publication Date |
Topic |
Identification Number |
Nearest Community |
USACE |
14 April 2025 |
Notification of Special Emergency Processing Procedures for Activities Subject to Executive Order (EO) 14156, Declaring a National Energy Emergency |
Alaska District SPN EO 14156
Alaska District SOP for Processing of Permit Applications in Emergency Situations Pursuant to Executive Order (EO) 14156 and 33 CFR 325.2(e)(4), 26 March 2025
EO 14156 FAQs
|
State of Alaska |
USACE |
28 January 2025 |
2024 Draft National Wetland Plant List Public Comment Period
|
SPN_Draft2024_NWPL
Federal Register: National Wetland Plant List
|
USA |
USACE |
22 January 2025 |
Alaska District Compensatory Mitigation Considerations
|
USACE SPN-ADCMC
Alaska_District_Compensatory_Mitigation_Considerations
|
State of Alaska |
USACE |
10 October 2024 |
PACIFIC OCEAN DIVISION REGULATORY ACTION PRIORITIZATION |
USACE SPN |
State of Alaska |
USACE |
15 May 2024 |
PERMIT APPLICATIONS ARE NOW AVAILABLE IN RRS! |
USACE RRS SPN |
State of Alaska |
Pebble Limited Partnership |
15 April 2024 |
Notification of Appeal Remand Decision for Pebble Limited Partnership’s Application
|
POA-2017-00271 SPN
POA-2017-00271 RECORD OF DECISION
|
State of Alaska
|
Southeast Alaska Watershed Coalition (SAWC) |
19 March 2024 |
POA-2012-00138 Ward Creek Watershed Mitigation - Site Addition for Southeast Alaska Mitigation Fund in Lieu Fee Mitigation Program |
POA-2012-00138 Ward Creek SPN |
Angoon, Alaska |
U.S. Army Corps of Engineers
|
04 Dec 2023 |
Notice of Reissue Regional General Permit (RGP-07), Statewide Rural Development |
POA-2007-00541-M3, RGP-07, Rural Development, SPN Reissue
|
State of Alaska |
U.S. Army Corps of Engineers |
04 Aug 2023 |
Notice of Intent to Reissue General Permit (RGP-07) SPN
|
POA-2007-00541-M3 SPN
|
State of Alaska |
Pebble Limited Partnership |
10 May 2023 |
Withdrawal of the Notification of Appeal Remand for Pebble Limited Partnership’s Application |
POA-2017-00271 SPN Withdrawal
|
State of Alaska |
Pebble Limited Partnership |
02 May 2023 |
Notification of Appeal Remand for Pebble Limited Partnership’s Application
|
POA-2017-00271 SPN
|
State of Alaska |
U.S. Army Corps of Engineers |
29 Mar 2023 |
Consultants List Update Request |
Consultants List Update Request SPN
|
State of Alaska |
Southeast Alaska Watershed Coalition (SAWC)
|
02 Dec 2022 |
South Fork Skanâxheen and Shorty Creek Wetland and Stream Restoration Mitigation Plan |
POA-2012-00138 SPN
|
Kake |
U.S. Army Corps of Engineers |
28 Sep 2022 |
RE-ISSUANCE OF REGIONAL GENERAL PERMIT (RGP)-10 POA-2016-00476 |
POA-2016-00476_SPN to Reissue
|
Bethel |
U.S. Army - Alaska |
27 Sep 2022 |
Eagle River Restricted Area, Final Rule |
POA-2010-00309_SPN
|
Eagle River |
Southeast Alaska Land Trust |
23 Jun 2022 |
Southeast Alaska Land Trust Program Instrument
|
POA-2010-00123 SEALT Program Instrument_SPN
|
Southeast Alaska |
U.S. Army Corps of Engineers |
13 Jun 2022 |
Notice of Intent to Re-issue General Permit RGP-10 |
POA-2016-00476_SPN
|
Bethel |
U.S. Army Corps of Engineers |
28 Apr 2022 |
POA-2020-00546, Section 214_SPN
MOA Finalized
|
POA-2020-0546 SPN
|
Port of Alaska |
U.S Army - Alaska
|
21 Jan 2022 |
Proposed Eagle River Restricted Area
|
POA-2010-00309_SPN
|
Eagle River |
U.S. Army Corps of Engineers
|
20 Jan 2022 |
TIME EXTENSION OF EXISTING GENERAL PERMIT
POA-2016-00476 TO AUGUST 7, 2022 |
POA-2016-00476_SPN
|
Bethel |
Southeast Alaska Watershed Coalition |
14 Dec 2021 |
Southeast Alaska Mitigation Fund |
POA-2012-00138 East Ohmer Creek_SPN
|
Petersburg area |
U.S. Army Corps of Engineers |
22 Jul 2021 |
POA-2020-00546, Section 214_SPN
Proposal to Expedite Permit Review
|
POA-2020-00546, Section 214_SPN |
Port of Alaska |
U.S. Army Corps of Engineers |
01 Jul 2021 |
RGP-04 Reissuance Permit
POA-2007-00372, (RGP-04) Special Public Notice
POA-2007-00372 (RPG 04)
Regional General Permit (RGP) Certification
|
POA-2007-00372-M4, RPG04_ Reissuance Permit
POA-2007-00372, (RGP-04)_SPN
POA-2007-00372, RGP04_Permit
POA-2007-372-M4-RGP-4_Cert
Nationwide Permit Pre-construction Notification (PCN)
|
Costal Section 10 |
U.S. Army Corps of Engineers |
16 Jun 2021 |
Announcement of Availability of the Stream Quantification Tool for the Interior of Alaska |
Stream Quantification Tool_SPN |
Interior of Alaska |
U.S. Army Corps of Engineers |
26 Apr 2021 |
POA-1993-00010-M4, Residential Development
POA-1993-00011-M4, Linear Infrastructure Development
POA-1993-00012, Commercial, Institutional and Community Development
|
MOA RPG_SPN |
Municipality Of Anchorage |
U.S. Army Corps of Engineers |
22 Mar 2021 |
*Revised* Announcing virtual public outreach workshop for the newly released North Slope RGP-05
|
POA-2013-00094 (RGP-05)_SPN Revised |
North Slope of Alaska |
U.S. Army Corps of Engineers |
03 Mar 2021 |
Announcing the Alaska District's Regional Conditions to the New Nationwide Permits |
POA-2021-6, Nationwide Permit Regional Conditions_SPN
POA-2021-6, Final 2021 Regional Conditions
POA-2021-6, Nationwide Permit General Conditions Definitions
POA-2021-6, ADEC 401 WQC
POA-2021-6, EPA R10 401 WQC
|
State of Alaska |
|
11 Feb 2021 |
Issuance of Regional General Permit (RGP) POA-2013-00094 (RGP-05) North Slope of Alaska
|
POA-2013-00094 (RGP-05)_SPN
POA-2013-00094 (RGP-05)_RGP
POA-2013-00094 (RGP-05)_Map of Coverage Area
POA-2013-00094 (RGP-05)_Site Description
POA-2013-00094 (RGP-05)_Drawing Figures 1-4
POA-2013-00094 (RGP-05)_CDD
|
North Slope of Alaska |
U.S. Army Corps of Engineers |
14 Jan 2021 |
Reissuance of Nationwide Permits |
POA-2021-6_SPN
|
Statewide |
|
13 Jan 2021 |
Issuance of Regional General Permit
POA-2017-00227 (RGP-03)
Military Training Activities
|
POA-2017-00227 (RGP-03)_SPN
POA-2017-00227 (RGP-03)_RGP
|
United States Army Garrison Alaska (USAGAK) and its cooperators
|
General Public |
12 Nov 2020 |
Special Public Notice Revision |
POA-2007-00372-M2_SPN
|
None |
|
02 Nov 2020 |
Reissuance of General Permit
POA-2014-00055-M1 (RGP-08)
Placer Mining Activities within the State of Alaska
|
POA-2014-00055-M1, Statewide_SPN POA-2014-00055-M1, Statewide_RGP
|
Statewide |
Ecosystem Investment Partners |
27 Oct 2020 |
Ecosystem Investment Partners |
POA-2019-00156_SPN
|
Utqiagvik (Formally known as Barrow) |
General Public |
01 Oct 2020 |
Time Extension of Expiration of Regional General Permits (RGPs) |
POA-1993-00011-M4, Linear Infrastructure Development, and
POA-1993-00012-M4, Commercial, Institutional and Community Development
SPN MOA RGPs - Time Extension
|
Municipality of Anchorage |
General Public |
28 Sep 2020 |
U.S. Environmental Protection Agency (EPA) Clean Water Act Section 401 Certification Rule as it applies to Department of the Army (DA) permits for activities in Alaska.
|
SPN Clean Water Act Section 401 Certification rule
|
Statewide |
General Public |
11 Sep 2020 |
Corps of Engineers Regulatory Program
Consultant-Supplied Jurisdictional Determination Reports
|
SPN-2020-00399 Statewide_Consultant-Supplied JD Reports
|
Statewide |
Southeast Alaska Mitigation Fund |
04 Aug 2020 |
Notice to modify the existing In-Lieu Fee Instrument by adding the Castor Creek Culvert Removal Mitigation Site |
SPN-2012-00138, Castor Creek_SAMF
|
Southeast AK |
Pebble Limited Partnership |
24 Jul 2020
|
NOTICE OF AVAILABILITY FOR THE PEBBLE PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT |
POA-2017-00271, Multiple, SPN
|
Multiple |
|
09 Apr 2020 |
Reissuance of General Permit
POA-2014-00055-M1 (RGP-08)
Placer Mining Activities within the State of Alaska
|
POA-2014-00055-M1, Statewide_SPN
POA-2014-00055-M1, Statewide_RGP Draft
|
Statewide |
|
06 Feb 2020 |
REISSUANCE OF REGIONAL GENERAL PERMIT (RGP) POA-1987-00003-M7 (RGP-09) |
POA-1987-00003-M7_SPN
|
Kenai Peninsula
|
U.S. Army Corps of Engineers |
27 Jan 2020 |
Notice of Intent to issue
General Permit RGP-03
Military Training Activities
|
POA-2017-00227 (RGP-03)_SPN
POA-2017-00227 (RGP-03)_Draft RGP
POA-2017-00227 (RGP-03)_GPA
|
United States Army Garrison Alaska (USAGAK) and its cooperators
|
|
09 Dec 2017 |
To reauthorize and rename GP- 1987-00003-M6 (Mooring Buoys on the Kasilof River) and change the administrative number to RGP POA-1987-00003-M7. |
RGP POA-1987-00003-M7, Kasilof
POA-1987-00003-M7, Kasilof River_DRAFT RGP
|
Kenai Peninsula |
|
11 Oct 2019 |
Announcing the Release of Form ENG 6082 – Nationwide Permit (NWP) Pre-Construction Notification (PCN) |
Release of Form ENG 6082 |
Statewide |
|
11 Sep 2019 |
Re-issuance of Regional General Permit POA-2007-00541-M2 (RGP-07) |
RGP 401 Cert
RGP Application
POA-2017-00541-M2, Rural Development_SPN |
Statewide |
ENI U.S. Operation Co. Inc. |
26 Jul 2019 |
Notice of Intent to Transfer Ownership |
POA-2019-00445, SPN
|
Nuiqsut, AK |
ConocPhillips AK |
26 Jul 2019 |
Notice of Intent to Transfer Ownership |
POA-2019-00444, SPN
|
Nuiqsut, AK |
U.S. Army Corps of Engineers |
25 Jun 2019 |
Notice of Intent To Issue General Permit RGP-05
North Slope Activities
|
POA-2013-00094 (RGP-05), Multiple Waterways_PN
POA-2013-00094 (RGP-05), Multiple Waterways_draft RGP
POA-2013-00094 (RGP-05), Multiple Waterways_PCN for RGP
|
North Slope Borough Communities |
DOD/USACE |
10 Jun 2019 |
National Wetland Plant List |
Notice in the Federal Register |
National |
Ecosystem Investment Partners |
14 May 2019 |
Charles Etok Edwardsen Mitigation Bank |
POA-2019-00156_SPN
CEEMB-Prospectus-05Mar2019
|
UtQiagvik (Formally known as Barrow) |
The General Public |
03 May 2019 |
Time Extension of General Permit POA-2007-0372-M1 to August 6, 2019
|
POA-2007-00372-M1, SPN
|
None |
The General Public
|
03 May 2019 |
Notice of Intent to Re-issue Regional General Permit (RGP-07) |
SPN-2007-00541-M2
|
None |
The General Public |
10 Apr 2019 |
Notice of Intent to Re-issue Regional General Permit (RGP-04) |
POA-2007-00372-M2_SPN
|
None |
The General Public |
14 Feb 2019 |
WOTUS STEP 2 |
WOTUS STEP 2 |
None |
The General Public |
15 Jan 2018 |
Notice of Intent to Re-issue General Permit 98-01-M4
|
SPN-2006-00215-M3
|
None |
Colaska Inc. |
18 Dec 2018 |
Diamond Willow Mitigation Bank |
SPN-2017-00407
|
Matanuska-Susitna Borough |
General Public |
10 Dec 2018 |
Time Extension |
POA-2006-00215-M3_GP_SPN
|
None |
General Public |
28 Nov 2018 |
Time Extension |
SPN-2007-00541-M1, SPN Extension.pdf
|
None |
General Public |
28 Nov 2018 |
Time Extension |
RGP POA-2007-00372, SPN_RGP Extension.pdf
|
None |
South East Alaska Land Trust |
08 Aug 2018 |
Honsinger WMP SPN |
POA-2010-00123, Honsinger WMP_SPN.pdf
|
Juneau |
Castle Group |
03 Jul 2018 |
Updated Public Notice |
POA-2017-00492,Campbell Creek_UpdatedPN
|
Anchorage |
ASAP |
22 Jun 2018 |
Final SEIS |
POA-2009-00651 |
Statewide |
General Public |
08 Jun 2017 |
Time Extension |
POA-2007-00541-M1_SPN Time Extension
|
None |
Donlin |
27 Apr 2018 |
Notice of Availability for Final Environmental Impact Statement |
SPN-1995-00120, Donlin_FEIS.pdf
|
Village of Crooked Creek |
Alaska Railroad Corporation |
09 Apr 2018 |
Proposal to Develop a Mitigation Bank |
SPN-2017-55, Portage Reserve Mitigation Bank Prospectus.pdf
|
Southcentral Alaska |
Pebble Limited Partnership |
06 Apr 2018 |
Notice to Extend Public Scoping Period |
POA-2017-271-Special Public Notice scoping extension |
South West Alaska |
The General Public |
30 Mar 2018 |
Time Extension of General Permit POA-2007-372-M1
|
RGP POA-2007-372-M1_SPN |
None |
Pebble Limited Partnership |
30 Mar 2018 |
Notice of Intent to Prepare an Environmental Impact Statement |
POA-2017-271_Notice of Intent |
South West Alaska |
The General
Public
|
29 Dec 2017
|
Reissuance of Regional General Permit (RGP) 2006-214-M3, as RGP-02
|
POA-2006-215-M4_Letter_Drawings.pdf
|
Wrangell |
The General Public |
6 Dec 2017
|
Extending the time limit
for use of Regional
General Permit
|
SPN-2007-541-M1 Extend_20171206
|
Statewide |
US Army Corps of Engineers |
02 Oct 2017
|
Operational Draft Regional Guidebook for the Rapid Assessment of Wetlands in the North Slope Region of Alaska |
SPN-2017-484_SPN |
North Slope Region |
US Army Corps of Engineers |
28 Sep 2017 |
Floating Recovery Devices within the State of Alaska |
SPN-POA-2007-372-M1 |
Statewide |
US Army Corps of Engineers |
26 Sep 2017 |
Anchorage Debit Credit Method |
SPN-2009-829-2, ADCM |
Anchorage, Alaska |
Alaska Railroad Corporation |
26 Sep 2017 |
Portage Reserve Mitigation Bank Prospectus
|
SPN-2017-55, Portage Reserve Mitigation Bank Prospectus
SPN-2017-55, Prospectus
SPN-2017-55, Figures
SPN-2017-55, Appendix A, B and C
|
Southcentral Alaska |
City of Nome |
23 Aug 2017 |
RPG-01, Nome |
SPN-Nome RGP-01, FINAL
RGP-01 NOME
|
Nome, Alaska |
U.S. Army Corps of Engineers |
07 Aug 2017 |
Proposed alternative method for calculating amounts of Debits in Anchorage Municipality
|
SPN-2009-829 ADCM for GPs 2 |
Anchorage, Alaska |
U.S. Army Corps of Engineers |
08 May 2017 |
Updated 2016 Alaska and National Wetland Plant List |
SPN-2017-1, Updated 2016 AK NWPL and NWPL List
2016 Alaska Wetland Plant List
|
State of Alaska |
Alaska Railroad Corporation |
25 Apr 2017 |
Portage Reserve Mitigation Bank Prospectus |
POA-2017-0055, Turnagain Arm_SPN
Portage Reserve Mitigation Bank Prospectus
Portage Reserve Mitigation Bank Prospectus-Appendix A
Portage Reserve Mitigation Bank Prospectus-Appendix B
Portage Reserve Mitigation Bank Prospectus-Data Forms
Portage Reserve Mitigation Bank Prospectus-Observation Points
|
Southcentral Alaska |
US Army Corps of Engineers |
15 Mar 2017 |
Announcing the Alaska District's Regional Conditions to the New Nationwide Permits |
POA-2016-6, New Nationwide Permit Conditions_SPN.pdf
POA-2016-6, Final 2017 Regional Conditions_SPN.pdf
POA-2016-6, 401 Certificate of Reasonable Assurance_SPN.pdf
POA-2016-6, EPA decisions_SPN.pdf
|
State of Alaska |
City of Nome |
01 Mar 2017 |
Issuance of RGP-01, Nome |
POA-2006-214-M2, Nome_RGP-01,SPN.pdf
|
Nome Alaska |
City of Bethel |
07 Feb 2017 |
Issuance of RGP-10, Bethel POA-2016-476 |
POA-2016-476, Bethel_General Permit_Drawings
POA-2016-476, Bethel_RGP-10_Compliance Determination
|
Bethel Alaska |
US Army Corps of Engineers |
17 Jan 2017 |
Re-Issuance of Nationwide permits |
POA-2016-6_SPN |
Statewide |
City of Bethel |
26 Sep 2016 |
Re-Issuance of General Permit POA-2011-124 as POA-2016-476 |
POA-2016-476 Bethel GP reissuance PN
Bethel RGP Reissuance POA-2016-476
Bethel RGP PCN POA-2016-476
Bethel GP POA-2011-124
|
Bethel, AK |
US Army Corps of Engineers |
21 Sep 2016
|
Alaska District Credit Debit Methodology |
SPN-Final Methodology
Alaska District Credit Debit Methodology Version 1
|
Statewide |
US Army Corps of Engineers |
09 Aug 2016 |
POA-2011-124, Time Ext of Existing GP |
POA-2011-124, Time Ext of GP_SPN |
Bethel, Alaska |
US Army Corps of Engineers |
14 June 2016 |
POA-2016-6, Nation Wide Permit Reissuance |
POA-2016-6, Nation Wide Permit Reissuance_SPN
ADEC_SPN
|
Statewide |
Calista Corporation |
08 Jun 2016 |
Kuskokwim Mitigation Bank Prospectus |
SPN-2014-28, KuskokwimMitigationBank_PN.
SPN-2014-28, KuskokwimMitigationBank_Prospectus
|
Southwest Alaska |
US Army Corps of Engineers |
29 Apr 2016 |
EXTENSION
Methodology for Assessing Functional Gains and Losses for Permittee Responsible Compensatory Mitigation and Calculating Compensatory Mitigation Credits and Debits for Third Party Mitigation Providers in the Alaska District
|
SPN-2016-187, Methodology Extension
SPN-2016-187, Alaska District Credit Debit Methodology Attachment
|
Statewide |
US Army Corps of Engineers |
29 Apr 2016 |
Methodology for Assessing Functional Gains and Losses for Permittee Responsible Compensatory Mitigation and Calculating Compensatory Mitigation Credits and Debits for Third Party Mitigation Providers in the Alaska District
|
SPN-2016-187_Methodology
SPN-2016-187_4-29-2016 Alaska District Credit-Debit Methodology-Attached to SPN
|
Statewide |
US Army Corps of Engineers |
26 Apr 2016 |
Donlin Gold Mine
Draft Environmental Impact Statement (EIS)
|
POA-1995-120, Crooked Creek, SPN Extension |
South Central/Southwest |