Permit Application Public Notices

Photo by Rebecca Manbeck

Public involvement is a key element of the Corps’ permit review process. During an application review, the USACE, Regulatory Division considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. This is accomplished through the posting of a Public Notice on the USACE, Regulatory Division's website and soliciting comments.

The USACE, Regulatory Division publishes monthly a list of individual permits issued, denied, or pending during the previous month. The list will identify each action by public notice number, name of applicant, and brief description of activity involved. It will also note the relevant environmental documents and the Statements of Findings (SOF) or Records of Decision (ROD) that are available upon written request through the FOIA process and, where applicable, upon the payment of administrative fees.

Special Public Notices

These are public notices that involve the Regulatory program but which are generally not limited to one particular project. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, issuance/re-issuance of General Permits (Regional General Permits or Nationwide Permits), changes to guidance and policies, etc.

Go to Special Public Notices

Search for a Public Notice

Search by POA number or by keyword, such as a location.

Public Notices

Results:
Archive: 2022
Clear
  • Revised Public Notice-POA-1981-00312-M5, Beluga Lake

    Expiration date: 2/7/2022

    The time limit to submit comments on the proposed project has been extended to February 7, 2022. All comments should reach this office no later than the expiration date of this revised Public Notice to become part of the record and be considered in the decision. All other information contained in the previous notice remains the same. Please bring this announcement to the attention of anyone you know who is or may be interested. Please contact Randal Vigil at (907) 201-5022, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.

  • POA-2013-00286 Tanana River_PN

    Expiration date: 2/13/2022

    Peak Gold LLC states purpose is to profitably produce gold from land owned by the Native Village of Tetlin utilizing open-pit mining methods and existing proven recovery processes. The need for the project is for the Native Village of Tetlin and Peak Gold, LLC a legal corporation operating in Alaska, to benefit Native peoples and shareholders in a joint partnership to mine the Manh Choh Project, hauling the ore to Fort Knox for processing to meet global demand. The proposed project would mine gold near the Native Village of Tetlin. Fill would be permanently placed in 5.2 acres of waters of the U.S. via earthwork needed to extract gold-laden ore, deposit waste rock (non-ore bearing rock), and develop the infrastructure necessary to conduct the operation including hauling the ore to Fort Knox. The waters that would be affected are predominantly wetlands, but also include a small part of a pond and a very small part of a non-fish bearing stream. The project site is located at Sections 1-3 & 10-16, T. 16 N, R. 13 E.; Sections 1, 2, 6, 7 & 18, T. 16 N, R. 14 E.; Section 6, T. 16 N, R. 15 E.; Sections 23-25 & 34-36, T. 17 N, R. 13 E.; Sections 19-22, 26, 27, 29-36, T. 17 N, R. 14 E.; Sections 13 &14, T. 17 N, R. 13 E.; Sections 5, 8, 9, & 16-18, T. 17 N, R. 14 E.; Sections 19, 20, 29, & 32, T. 18 N, R. 14 E.; Copper River Meridian; Latitude 63.1834º, Longitude -142.8937º; within lands owned by and proximal to the Native Village of Tetlin, Alaska. See Sheets 1-31 enclosed with this notice. Please contact Greg Mazer at (907) 347-9059, toll free from within Alaska at (800) 478-2712, by fax at (907) 474-2164, or by email at Gregory.j.mazer@usace.army.mil if further information is desired concerning this notice.

  • Final PN_NWP FR_Jan_2022

    Expiration date: 3/14/2026

    On December 27, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 73522) announcing the reissuance of 40 existing nationwide permits (NWPs) and one new NWP. These 41 NWPs will go into effect on February 25, 2022, and they will expire on March 14, 2026.

  • POA-1981-00312-M5, Beluga Lake_PN

    Expiration date: 1/24/2022

    Alaska Department of Transportation and Public Facilities (ADOT&PF) (Heidi Zimmer), PO Box 196900, Anchorage, Alaska 99519-6900 stated the purpose is to improve safety for runway operations, taxiing, and aircraft parking; extend the service life of airport facilities; and increase availability of leased tie-down facilities for General Aviation users. The applicant’s stated purpose is to improve safety for runway operations, taxiing, and aircraft parking; extend the service life of airport facilities; and increase availability of leased tie-down facilities for General Aviation users. All work would be performed in accordance with the enclosed plan (sheets 1-10), dated December 3, 2021. The project site is located within Section 15, 21, and 22, T. 6 S., R. 13 W., Seward Meridian; USGS Quad Map Seldovia C-4; Latitude 59.64249º N., Longitude 151.48474º W.; Homer Airport, in Homer, Alaska. Please contact Randal Vigil at (907) 201-5022, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.

  • POA-2001-00086, Thayer Creek_PN

    Expiration date: 1/20/2022

    Kootznoowoo, Incorporated (Jonathan J. Wunrow), 8585 Old Dairy Road, Suite 104, Juneau, AK 99801. The applicant stated the purpose is to bring reliable, lower-cost renewable energy to Angoon by constructing a financially viable and logistically feasible hydroelectric facility on Thayer Creek, which will reduce energy costs for Angoon and its consumption of and dependence on diesel fuel, and in turn, improve air quality in the community. The application requests authorization to place fill material into waters of the United States to construct the following project components: 1. A 19 foot high concrete gravity diversion structure at the head of the anadromous fish barrier falls on Thayer Creek that would create an approximately 0.7 acre impounded area. 2. A concrete intake structure and sluiceway on the northwestern abutment of the diversion structure (Diverted flow would first enter the sluiceway, then be drawn through a trashrack and into the penstock to reach the powerhouse). 3. A 72-inch diameter steel pipeline (penstock), approximately 85 feet long, to convey water from the intake structure to the powerhouse. 4. A powerhouse, approximately 30 feet long by 40 feet wide and 25 feet tall, to contain a vertical-axis Kaplan turbine and synchronous generator with a rated capacity of 800 to 850 kilowatts (kW). 5. A short tailrace channel to return flows to Thayer Creek near the base of the falls. 6. A small electrical switchyard located adjacent to the powerhouse. 7. An unpaved, gravel access route approximately 6.7 miles long, to provide reliable year-round access to the hydroelectric facility on Thayer Creek and along the overhead transmission line for construction and long-term maintenance, including bridges and culverts to maintain drainage and fish passage, as needed, and quarry site(s) adjacent to the access route to generate fill material for the road, staging areas, the switchyard, and the powerhouse site. 8. A 12.5-kilovolt overhead transmission line to transmit the power generated at Thayer Creek to Angoon, which would consist of two segments: a. An overhead transmission line, approximately 6.7 miles long, to transmit power from the switchyard to a transition staging area directly across from Angoon, and b. An approximately 1,400 foot long submarine cable in a directionally drilled micro-tunnel under Kootznahoo Inlet to an interconnection point in Angoon. 9. A marine barge landing and small boat boarding float on Kootznahoo Inlet (Stillwater Anchorage). The landing area’s drivable surface would be approximately 24 feet wide and 225 feet long. Ten 24-inch diameter steel pipe piles would be permanently installed below the Mean High Water Mark (approximate elevation +13 feet below the 0.0 foot contour) would support the boarding float. 10. A 125 by 200 foot staging and permanent storage yard upslope from the marine landing to facilitate construction and for long-term storage and maintenance, including quarry site(s) adjacent to the access route to generate fill material for staging areas and an access route connecting to the marine access point. 11. A 50 by 100 foot work area from which to conduct horizontal directional drilling (HDD) and transition the above-ground transmission line to a submarine cable in the directionally drilled micro-tunnel from Turn Point to Angoon. All work would be performed in accordance with the enclosed plan (sheets 1-29), dated November 24, 2021. The project site is located within Section 35, T. 49 S., R. 67 E., Section 2, 11, 12, 13, 24, 25, T. 50 S., R. 67 E., and Section 30, T. 50 S., R. 68 E., Copper River Meridian; USGS Quad Map Sitka C-2; Latitude 57.553709º N., Longitude 134.600859º W.; near Angoon, Alaska. Please contact Randal Vigil at (907) 201-5022, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.